Toronto, ON

Wellesley CC - Phase 2

Read Full Project Profile

Phase 2 of the Wellesley Community Centre includes an Aquatic Centre with a 5-lane 25m lap pool, leisure pool, waterfall feature and steam room, as well as multipurpose community rooms and a green roof. Targeting Toronto Green Standard, this phase will have a minimum of 5% of its energy provided from renewable energy sources.

HVAC systems installed include for hot water heating plant, geothermal loop, and condenser water loop serving the various heating/cooling heat pumps.  Also included are a RTU for OA make-up, a Dectron pool dehumidification system and domestic HW system. The building has full DDC control down to and including the individual spaces.
Electrical systems installed included for an emergency back-up generator and LV digital lighting control system.

Services provided by CFMS:

·       Contract document review

·       Commissioning coordination

·       Installation review from a commissioning perspective

·       Managing of static and dynamic M&E contractor tests

·       Verification of DDC system and BAS

·       100% performance testing of HVAC systems

·       Verification of LV lighting system

·       Co-ordination of M&E equipment and systems training

·       Seasonal performance testing of HVAC system