During the building envelope commissioning process the following items are verified against the contract documents to ensure the owner’s requirements are met: solar radiation, heat loss/gain, air movement, water vapour and noise. A failure in the building envelope system could negatively affect the performance of the mechanical systems, occupant comfort, and the structure of the building. LEED has recognized the importance of envelope commissioning and it is to be incorporated into V4 which comes into effect July 2016.